OCP Consortium Mandate

OCP Standards Framework — Binding for All Members

DAISA consortium members operate under Open Compute Project (OCP) standards as a binding requirement for participation in distributed regional compute infrastructure.

Binding: All Members Mandatory Compliance

Consortium Strategic Mandate

By eliminating proprietary hardware dependencies, the DAISA framework removes vendor lock-in across compute, storage, and networking layers. This enables sovereign entities to deploy interoperable infrastructure with reduced lifecycle cost and increased auditability.

Enforced OCP Core Specifications

Open Rack V3

All deployments must conform to ORv3 structural and thermal design standards.

48V Power Architecture

Centralised 48V busbar systems with hot-swappable shelves.

Liquid Cooling

Direct-to-chip cooling with standardised manifold interfaces.

Open Firmware

Auditable stacks such as OpenBMC and coreboot only.

Procurement & Governance

Procurement processes ensure openness, modularity, and sovereign oversight.

Open Procurement

Multi-vendor sourcing is mandatory. Single-vendor lock-in is prohibited.

Lifecycle Modularity

Upgrades must be component-level, minimising e-waste.

Continuous Audit

Quarterly compliance audits mapped to OCP certification lists.

Sovereign Reporting

Bi-annual compliance reporting to host authorities.

Mandatory Reporting

Member Obligations

Inventory Register

Maintain a 90-day rolling hardware inventory.

Firmware Attestation

Submit firmware reports within 14 days of provisioning events.

Networking Compliance

Adopt OCP-compliant networking hardware within 18 months.

Interoperability Validation

Participate in annual interoperability test cycles.

Supply Chain Reporting

Report non-compliant supply chain events within 48 hours.

Non-Compliance Protocol

Level 1

Advisory Notice

Formal notice with 30-day remediation window.

Level 2

Supervised Remediation

Embedded technical oversight and corrective plan.

Level 3

Suspension

Temporary loss of access until compliance is restored.

Level 4

Expulsion

Permanent removal from consortium participation.